Agronomed Pharmaceuticals

Commercial Warehouse Builder PA

  • Year Built: 2019
    Building Type: Warehouse
    Building Dimension: Multiple
  • Location: Chester, PA
  • 6 Building Project Totaling 61,240 sq ft
  • Scope:  Furnish and Erect PEMB including Energy Saver Insulation Package

Details:

As a commerical warehouse builder in PA, Steelsmith, Inc is often tapped to erect multi-phase projects. Phase One of the Agronomed project kicked off in early March 2019, with the construction of a 5900 square foot single slope steel building, complete with (3) roof curbs, 6" roof and wall insulation, (2) overhead doors, and (2) man doors.

As 9 more loads of steel arrived, the Steelsmith crew started setting for 27,000 square feet of steel for Phase 2. Included in our erection services were the framing and trimming of (9) roof curbs, double layer roof insulation, single layer wall insulation, roof to roof transitioning, and open wall conditions for a future addition.

Another 24,330 square feet of steel framed and sheeted for Phase Three of the Agronomed project, to include a High R-value roof insulation, single layer wall insulation, (3) roof curbs and the typical transition and flashing for building connection.

Completed in just under 11 weeks, Steelsmith enjoyed the opportunity as a commerical warehouse builder in PA to partner with a local Philadelphia general contractor to exceed expectations and meet deadlines.